Tuesday, April 29, 2008

Update on the Bathroom Project

The bathroom is usable again, but far from finished. We tore out the particle board flooring and found there was a little black mildew even on the bottom layer of plywood. I cleaned the wood as best I could, then gave it a couple of coats of Kilz primer, and The Farmer covered it with a layer of roofing tarpaper, then put a new layer of plywood down on the old layer, another layer of tarpaper, then underlayment board, and finally the new vinyl flooring. It looks fantastic! The “Old World Fresco” faux finish on the walls and the pattern on the flooring blend beautifully together.

The new toilet is in place. It takes a little getting used to. We got one of the taller ones with an elongated bowl, so it’s a little different seating! It only uses 1.6 gallons of water per flush, and the flapper closes back almost instantly leaving half the water still in the tank, so that’s different too. But it does the job, and that’s what counts!

The guys got the vanity lifted in place and it looks lovely. We still need to buy handles and pulls for the drawers. That should make it look even classier once they're attached.

Then after all that work, the big moment arrived to finally see the cultured marble vanity top. I was so excited to finally get to uncrate it and see what it looked like! And what did we see when we opened the box?

Yep, one corner was broken off, so there we were, finally ready to use it and no can do. Bummer. Worse, this is a special order deal, so it’ll be around 3 weeks before we get another. We had to take it back to the store, get a refund, and order a new one. In the meantime, we just put the old top back on. It wobbles a little as this vanity is a different size from the old one, but it’s usable.

There are still a lot of odds and ends to finish up. I have to stain the new door on one side, and paint it on the other. We put the old door back in place for now, so we can use the bathroom.

The Farmer needs to change the hanger placement on the corbels, then I need to stain them. They’ll go up first, then the cupboard over top of the toilet will sit on top of them. We also need to put the medicine cabinet back up, but need the new vanity top in place first so we can see where to place it between there and the light bar over top. The crown molding and baseboard and trim around the tub and surround needs cut and put in place. We need towel bars, the toilet paper holder and light switch covers put up.

Since we have to wait for a new vanity top and we can’t devote another week to working on the bathroom full-time, it will be a while before everything is done.

But it’s gonna look GREAT!

Labels:

1 Comments:

At April 29, 2008 10:03 AM , Blogger CeeCee said...

You are a far braver soul than me! Remodeling brings out the worst in me. I just want it done NOW! Especially when things happen like in your last post (water leak!!).
Commode on the front porch---you've got that Beverly HIllbillies thing started now. :)
Be sure and post pics of the finished project.

 

Post a Comment

Links to this post:

Create a Link

<< Home